Site Launch Qa

site-launch-qa.md

Markdown 3.7 KB 58 lines 3 sections

Site Launch QA

The checks to run before and right after a website goes live: a new site, a redesign, a platform migration, or a big new section. Product launches fail quietly when the site underneath them breaks, and most of these failures are invisible from the homepage.

Run it in three passes: before the switch, at the switch, and in the first two weeks after.

Before the switch

Content and links

  • [ ] Every page in the plan exists, with final copy (no lorem ipsum, "TBD," or test prices)
  • [ ] Crawl the staging site for broken internal links and missing images
  • [ ] Legal pages (privacy, terms, cookie policy) are present and current
  • [ ] Contact details, pricing, and plan names match what sales and support say

Forms and conversions

  • [ ] Submit every form with a test entry and confirm it reaches the inbox, CRM, or tool it should
  • [ ] Confirmation messages and redirects work, and spam protection doesn't block real submissions
  • [ ] Conversion tracking fires on the confirmed submission, not the button click (the conversion-tracking skill covers the setup and the test)
  • [ ] Analytics is installed once, on every page, with internal traffic filtered
  • [ ] Consent banner works and tags respect it

SEO

  • [ ] Every page has a unique title, meta description, and one H1
  • [ ] Canonical tags point to the production domain, not staging
  • [ ] Staging is noindex or password-protected, and production is not (the most common launch-day SEO failure is shipping the staging noindex)
  • [ ] robots.txt allows the pages you want indexed; the XML sitemap lists production URLs
  • [ ] Structured data validates (Rich Results Test for Google features, Schema Markup Validator for everything else)
  • [ ] For a migration: the redirect map is loaded and tested on a sample of old URLs (see the site-architecture skill's platforms and migration reference)

Performance and access

  • [ ] Core Web Vitals are acceptable on the key templates, on mobile
  • [ ] Pages work on mobile, in Safari, and inside in-app browsers (LinkedIn, Instagram, Facebook)
  • [ ] Images have alt text; forms have labels; keyboard navigation works
  • [ ] Open Graph images and titles render correctly when the URL is shared

Rollback

  • [ ] You know how to roll back on this platform, and someone has done it once. Examples: Vercel and Netlify promote a previous deployment; Webflow restores a site backup; WordPress restores from a backup plugin or host snapshot; Ploy ◆ promotes a previous deploy from its Deploys screen (its CLI always publishes to production, with no staging target, so preview before publishing).
  • [ ] DNS TTL lowered a day ahead if the switch involves DNS changes

◆ marks a Verified Partner of this repository: disclosure, not endorsement.

At the switch

  • [ ] Deploy redirects at the same moment as the new site
  • [ ] Confirm HTTPS works on every hostname (www and apex) and one redirects to the other
  • [ ] Load the top 10 pages by traffic and check content, title, canonical, and a 200 status
  • [ ] Submit one real form and confirm it arrives everywhere it should
  • [ ] Submit the sitemap in Search Console and Bing Webmaster Tools
  • [ ] Re-check that production isn't noindex

The first two weeks

  • [ ] Search Console: watch coverage and 404s daily for the first week, then weekly; fix missing redirects as they show up
  • [ ] Compare traffic and conversions to the same period before, page by page, not just in total
  • [ ] Confirm conversions are arriving in each ad platform at the expected rate
  • [ ] Fix internal links that still point at redirected URLs
  • [ ] Collect the bugs the team and customers report, and decide what's urgent

Other references

From the same skill.

View all 2 →

Related skills

More from the same category.

View all